• The Cabin, 16 Hartley Ct Rd, Reading RG7 1NS
  • Mon-Sat : 07:00 -17:00

How much does a consumer unit replacement cost in Reading?

At Forbury Electrical, a consumer unit replacement starts from £500. That includes a new RCBO board with surge protection, new meter tails, an in-line main switch, full testing and certification. Across the UK, replacing a consumer unit (fuse box) typically costs £450 to £750, rising to £700 to £1,200 in London and the South East, according to Fantastic Services’ 2026 price guide.

Your consumer unit is the box that controls and protects every circuit in your home. If yours still has old fuse wire, a wooden back or no RCD protection, it’s probably time for an upgrade. Here’s what affects the price and what you should expect for your money.

Consumer unit replacement costs by board type

To give you an idea of the wider market, these are typical 2026 all-in prices (labour, the unit and standard testing) for London and the South East:

Board type

Typical cost (London and South East)

Like-for-like main switch board, fewer circuits

£650 to £850

Standard dual-RCD board, up to 10 circuits

£700 to £950

High-integrity board with RCBOs and surge protection

£850 to £1,100

Larger 12 to 16 way board, or moving the board

£950 to £1,200

Source: Fantastic Services 2026 fuse box replacement cost guide.

A dual-RCD board splits your circuits into two groups. If one circuit trips, everything in that group goes off with it. An RCBO board protects each circuit on its own, so a fault on the kitchen sockets won’t knock out your lights or your fridge freezer.

That’s why we fit RCBO boards with surge protection (SPD) as standard. It saves you from nuisance tripping in the future, and the surge protection helps guard your electrics and appliances against voltage spikes.

What’s included in our price?

Every consumer unit replacement we carry out includes:

  • A new RCBO consumer unit with surge protection (SPD)
  • New meter tails and an in-line main switch
  • Removing and safely disposing of your old fuse box
  • Testing every circuit before and after the change
  • An Electrical Installation Certificate
  • Notifying Building Control under Part P of the Building Regulations

That last point matters. Replacing a consumer unit is notifiable work in England, so it must be carried out by a registered electrician, or signed off separately by Building Control. As a NICEIC-registered contractor, we handle the notification for you, and you’ll receive your certificate once the work is complete.

What can add to the cost?

Earthing and bonding. Before fitting a new board, we test the existing installation. If the main earth or the bonding to your gas and water pipes doesn’t meet current standards, it will need upgrading first. This is common in older properties.

Faults found during testing. A new board with modern RCD protection can reveal faults that an old fuse box was hiding, such as damaged cables or a neutral-to-earth fault. These need putting right before the new board will hold.

Moving the board. Relocating your consumer unit (out of a cupboard under the stairs, for example) means extending the cables, which adds time and cost.

Old wiring. If your cables are very old (rubber, lead or fabric-covered), a new board on its own isn’t enough. You may need a partial or full rewire first. Find out more on our partial and full rewires page.

Signs you need a new consumer unit

  • You still have rewireable fuses (the kind with fuse wire you replace by hand)
  • Your board has no RCD protection – there’s no “test” button on it
  • The board is wooden-backed or plastic and more than 20 to 25 years old
  • Your fuses or breakers trip often with no obvious cause
  • You notice a burning smell, scorch marks or a buzzing sound near the board
  • You’re adding new circuits, such as an EV charger, a kitchen extension or a garden office
  • Your EICR has recommended an upgrade – landlords, see our guide to EICRs for landlords

If you’re not sure, an Electrical Installation Condition Report will tell you whether your board and wiring are safe, and what needs doing.

How long does a consumer unit replacement take?

Replacing the board itself usually takes 4 to 6 hours. Testing every circuit and completing the certification takes a further 3 to 4 hours, so allow most of a day for the whole job. Your power will be off while the board is changed, so we’ll agree a time that works for you and let you know beforehand, so you can plan around fridges, freezers and working from home. Jobs that turn up earthing or wiring issues can take longer.

Why choose a NICEIC-registered electrician?

NICEIC-registered contractors are assessed regularly to make sure their work meets the current wiring regulations (BS 7671). Using a registered electrician means your work is notified to Building Control properly and certified. That matters when you sell your home, for your insurance, and most importantly for your family’s safety.

Get a quote for a new consumer unit in Reading

Forbury Electrical replaces consumer units across Reading, Berkshire, Hampshire and Oxfordshire, with prices starting from £500. We’ll look at your current board, explain what you need and why, and give you a clear price before any work starts.

Call us on 0118 907 5331 or send us an enquiry. You can also read more about our consumer unit replacement service.

Related Blogs

Write a Reply or Comment

Your email address will not be published. Required fields are marked *